Day 1
Lower body
- Barbell High Bar Squat4 × 6 · 80% e1RM
- Barbell Conventional Deadlift2 × 6 · 80% e1RM
Jonnie Candito's classic intermediate-to-advanced peaking program: six phases across the big three, from muscle adaptation → hypertrophy → linear strength → heavy adaptation → high-intensity testing. The data has five prescribed weeks; week 6 is optional (skip it, deload, or test your max).
Copy it to your plans in the free app. TopSet works out each set’s target weight from your training max or 1RM.
Download on the App StoreLower body
Upper body
Upper body
Lower body
Upper body
Lower body
Upper body
Lower body
Upper body
Upper body
Lower body
Upper body
Lower body
Upper body
Lower body
Upper body
Lower body
Upper body
Lower body
Upper body
Deadlift
The Candito 6 Week Strength Program is one of the most widely used free intermediate-to-advanced programs in powerlifting. It splits the 6 weeks into progressive training blocks: Week 1 muscle adaptation, Week 2 adaptation/hypertrophy (introducing the MR10 AMRAP set and high-density volume sets), Week 3 linear strength (4-6-rep big sets), Week 4 heavy adaptation (90%+ sets of three), and Week 5 high-intensity peaking (97.5% test sets of 1-4 reps). Week 6 is optional (see below).
3-5 sessions per week (Weeks 1-2: 5 sessions, lower/upper/upper/lower/upper; Weeks 3-4: 4 sessions; Week 5: 3 sessions). The horizontal pull / shoulder press / vertical pull accessory slots in the upper-body sessions are entered with the default options (barbell row/press/weighted pull-up) and can be swapped in the plan editor for the original sheet's alternatives such as dumbbell row, seated dumbbell press, or lat pulldown; you can add 1-2 accessories of your choice (8-12 reps) to each session, which this library doesn't include as placeholders. The deadlift variation means your choice of stiff-leg, wide-stance, deficit, or paused deadlift.
One 6-week round is one cycle, with no weight increases within the cycle (the sheet already includes ±2.5 kg micro-adjustments; see the set notes). At the end of the cycle, update your 1RM using the rules above and rerun. If you fail any required reps, lower your 1RM by 2.5% and continue.
The first two weeks build muscular endurance and leg drive before Weeks 3–5 strip away volume and push bar weights toward 95–97.5% of your 1RM:
Enter an honest, current 1RM you have actually hit recently (no straps/hitching, competition depth). Unlike 5/3/1, Candito 6-Week scales percentages directly from 1RM rather than a 90% Training Max.
In Session 1, hitting fewer than 8 reps means still finishing the 5 extra-volume sets at MR10 + 2.5 kg and dropping your 1RM by 2.5% afterward. In Session 2, exactly 7 reps trims the MR10 − 5 kg back-off work to 5 sets; hitting fewer than 7 reps skips those back-off sets altogether and lowers your squat 1RM by at least 2.5%.
The program allocates very high lower-body frequency in Weeks 1–2 and relatively moderate bench volume. Many lifters pair Weeks 1–5 with Jonnie Candito's optional extra pressing day or switch to a 4-day bench block once lower-body goals are met.
After completing Week 5's 97.5% × 1–4 test sets, you can: (1) skip Week 6 and start a new round immediately from your projected 1RM (2 reps × 1.03, 3 reps × 1.06, 4 reps × 1.09); (2) repeat Week 1 minus the final upper day as a deload; or (3) take a light taper and test true 1RM singles.
Yes, though repeating high-peaking cycles all year eventually catches up on joints and recovery. Running two rounds followed by a higher-rep hypertrophy block works well for most lifters.
Program by Jonnie Candito. TopSet is not affiliated with or endorsed by the program’s creator. Program names and trademarks belong to their owners. See the guide for original sources.